For the installation of a new pump at Cardiff Transfer Station, Alphateam was engaged to develop and commission the system architecture needed to bring the equipment up to operational standard.
We provided our client with a superior speed to service, delivering Variable-Speed Drive (VSD) integration, communications installation via Miri telemetry, and complete, in-house development and commissioning of HMI control profiles.